Case Studies

BAE Systems Case Study

Duration: 14 weeks

Location: Coningsby

  • All 240v and 400v electrical systems including:
  • Mains and Distribution panels/Boards
  • Energy monitoring
  • Surge protection
  • General and emergency lighting (LG7)
  • Small power
  • Voice and Data
  • Fire alarms system
  • Intruder alarm
  • Air Conditioning
  • Ventilation
  • Containment
  • PA System