Case Studies

Linwave Case Study

Contractor:            Direct for Client

Duration:               3 Weeks

Location:               Lincoln

  • Specialist Temperature Control HVAC & Air Quality System to Clean Room.
  • Bespoke design by Serco’s Special Projects Division.
  • Class 10,000 (ISO – 7).
  • Three Stage filtration including High Efficiency Particulate Air (HEPA) Filters.
  • Fresh Air Ventilation.
  • Air Conditioning.
  • Positive Pressure.
  • Specially designed and manufactured fabric and galvanized ducting achieving an air velocity of less than 0.1 metres per second.